Planning a 2027 Build
Why start in the winter
April is the busiest month at the lumber yard and at the permit office. Winter is when a build gets designed properly.
Time to decide
Over the winter there's time to work out the size, the layout and the materials, and change your mind without holding anything up.
Materials
Order early and you get the materials you picked, not whatever the yard has that week.
Permits
Apply over the winter and the permit is not what holds up the build.
How it works
We come and look
Measurements, grades, access, and the things that move a price: the slope, the gas line, the neighbour's fence sitting six inches over. If it is not something we do, we say so.
We plan it together
We work together over the winter to get the design right, from the materials to the overall design.
The build
Nothing is booked until you sign. Some people plan in January and build in June. Some call back the year after.